Rajesh and Ranadip Mandal (2016) “Cost estimation for widening of the existing 4-lane divided carriageway to 6-lane divided carriageway for 15 Km Length of Gurgaon Jaipur section of NH-8”, International Journal for Research Publication and Seminar, 7(2). Available at: https://jrps.shodhsagar.com/index.php/j/article/view/774 (Accessed: 23 November 2024).