PROPOSED MODEL TO STUDY THE EFFECTIVE UTILIZATION OF SPECIAL EQUIPMENT AT CONSTRUCTION SITE IN PUNE REGION – A REVIEW WORK

Authors

  • Pravin Dhumal M.Tech, Student, Civil (Construction & Management), School of Engineering and Technology, D.Y. Patil University, Ambi, Pune
  • Prof. Hemant H Salunkhe Faculty in Department of Civil Engineering, School of Engineering and Technology, D.Y. Patil University, Ambi, Pune

Keywords:

specialized equipment, utilization factors, cost benefit analysis

Abstract

India’s construction industry is going through changes after Corona Pandemic. It affected a large amount of construction work in terms men and material. Many of the equipment light and heavy one was seating idle. Gradually Development in Construction Sector gives rise to involvement of new and advance equipment in Construction Sector like use of Total Station, is survey and Cutting Machine like Tunnel Boring Machine, Hoisting like crane hanger. This review paper will study the utilization of such equipment. Methodology to be followed for this project is to study and shortlist such equipment to be used in Pune region comprising of Nagar Nashik or nearby region and prepare model on existing situation and to improve on the utilization of such Equipment in In Utilization aspect will be studied based on factors, cost, location, depreciating. This study will also focus on use of such equipment’s cost benefit analysis of such equipment for Indian Situation. In this paper we just review the previous research of various researcher regarding this topic.

References

Improvement of Overall Equipment Effectiveness In a Plastic Injection Moulding Industry, E.Sivaselvam, S. Gajendran IOSR Journal of Mechanical and Civil Engineering (IOSR-JMCE) e- ISSN: 2278-1684, p-ISSN: 2320–334X PP 12-16.

A Model Study on Comparative Cost Analysis Of Equipment Management In Construction Companies In Tirupati Region, Saikumar Tenepalli, K. Sai Kala, International Journal of Civil Engineering and Technology (IJCIET) Volume 8, Issue 1, January 2017, pp. 72–81, Article ID: IJCIET_08_01_008, ISSN Print: 0976-6308 and ISSN Online: 0976-6316.

A Thematic Review of the Main Findings on Construction Equipment over Recent Years, Ilias Naskoudakis, Kleopatra Petroutsatou, 47(2), pp. 110-118, 2016.

A Study And Analysis Of Construction Equipment Management Used In Construction Projects For Improving Productivity, M. Manikandan1, Prof.M.Adhiyaman, Dr.K.C.Pazhani International Findings Journal of Engineering and Technology (IRJET), Volume: 05 Issue: 03 Mar-2018.

Review Study on Improvement of Overall Equipment Effectiveness in Construction Equipment’s, Mr. Nilesh Ayane, Mr. Mangesh Gudadhe, 2015 IJEDR | Volume 3, Issue 2 | ISSN: 2321-9939.

Management of Equipment & Machinery in Construction, Prajeesh. V. P, Mr. N. Sakthivel, IJISET - International Journal of Innovative Science, Engineering & Technology, Vol. 3 Issue 5, May 2016.

Successful project management, Gido & Clements, Thomson South western collegepub. 2 nd Edition Aug.2003.

Project management a system approach to planning, scheduling and controlling”, Harold Kertzner, (Seventh Edition), John Wiley& sons.INC.2005.

Advanced project management a structural approach, F.L.Harrison, Gower Publishing Ltd. England, 1985.

Construction Project Management Planning, scheduling controlling”, Chitkarak.k.Tata McGraw Hill Pub. New Delhi, 1998

Sunaitan Al Mutairi, “Analysis of Delays during Initial Phase of Construction Projects and Mitigation Measures”, World Academy of Science, Engineering and Technology International Journal of Economics and Management Engineering Vol:11, No:3, 2017

Zane W Mitchell (Jr), “A statistical analysis of construction outfit form costs using held data & the accretion cost model”, Storming Media, 1998, ISBN- 1423560841, p.p.- 269.

Operation of Equipment & Machinery in Construction, Prajeesh.V. P,Mr.N. Sakthivel, IJISET- International Journal of Innovative wisdom, Engineering & Technology, Vol. 3 Issue 5, May 2016.

Project Management Body of Knowledge” PMI Standards committee. William R.Duncan, Director of standards, 2003.

Project cost control in action, O.P. Kharabanda, Stallworthy E.A. & Williams L.F Gower Publishing Ltd. May 1983.

Downloads

Published

30-09-2022

How to Cite

Pravin Dhumal, & Prof. Hemant H Salunkhe. (2022). PROPOSED MODEL TO STUDY THE EFFECTIVE UTILIZATION OF SPECIAL EQUIPMENT AT CONSTRUCTION SITE IN PUNE REGION – A REVIEW WORK. International Journal for Research Publication and Seminar, 13(4), 209–213. Retrieved from https://jrps.shodhsagar.com/index.php/j/article/view/302

Issue

Section

Original Research Article