Study and Analysis Construction Project Parameters to Achieve Project Life Cycle
Keywords:
Project Life Cycle, Risk Management, Site Selection, Design Phase, Taguchi method, ANOVAAbstract
Risk management is important for every construction project. It is use to improve performance of project and increase the profit. Now a day, project become very complex and they have particular budget. So, companies and manager have responsibility to complete the work with time and schedule. Project work presents an application of risk management in the early stage of a project life cycle of a construction. Project life cycle is a function of several parameters mainly the site selection, Design phase, Selection of Contractors, Project mobilization phase, Project operation phase and Project completion phase. The first three phases can be considered at the planning phases where the optimization and analysis is of great importance. The last three phases are the execution phases where in the real time field work and monitoring plays avital role. But very little scope for optimization is possible as it is much involved with man management. In that we study, analyse the planning phase i.e the Pre-project phase that involves the site selection, design phase and supplier selection phase, project mobilization phase. Questionnaire was prepared and circulated among thirty respondents and based on frequency three criterion were selected for study. These criterions were then optimized by using Minitab software. Software included an arrangement by Taguchi method and One-way ANOVA method was used to find the optimal values for the criterion. The recommendations of these critical components were then done for optimal project life cycle.
References
Leonas Ustinovicius, Romas Rasiulis, Lukasz Nazarko, Tatjana Vilutiene, Marius Reizgevicius “Innovative research projects in thre field of Building Lifecycle Manageent” Procedia Engineering 122 (2015)
Luiz Henrique Rodrigues-da-silva, Jose Antonio Crispim “The project risk management process, a preliminary study” Procedia Technology 16 (2014)
P.N. Sharratt, P.M. Choong “A life cycle framework to analyse business risk in process industry projects” Journal of Clear Production 10 (2002)
Kumar PS, ThirumurugaPoiyamozhi MVV “Performance evaluation of major risk factors affecting construction projects” Rev. Tec. Ing. Univ. Zulia. 2016
Dr. Neeraj, D. Sharma, Hiren A. Rathod “Risk Identification Analysis in Construction Project” International journal of Advanced Research in Engineering, science & Management
Divya Gupta, manoj sharma, Dr, Ashutosh Shankar Trivedi “Risk management: identifying key risk in construction projects” International Journal of Civil and structural Engineering Research 2016
Surubhi Mishra, Brajesh Mishra “A Study on Risk Factors Involved in the Construction projects” International Journal of Innovative Research in Science, Engineering and rchnology
Yu-Ren Wang, G. Edward Gibson Jr “A study of preproject planning and project success using Ann and Regression Models” International Symposium on Automation and Robotics on Construction
S.M. Renuka, C. Umarani, S. Kamal “ A Review on Critical Risk Factors in the Life Cycle of Cnstruction Projects” Jouranal of Civil Engineering Research 2014
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2018 International Journal for Research Publication and Seminar
This work is licensed under a Creative Commons Attribution 4.0 International License.
Re-users must give appropriate credit, provide a link to the license, and indicate if changes were made. You may do so in any reasonable manner, but not in any way that suggests the licensor endorses you or your use. This license allows for redistribution, commercial and non-commercial, as long as the original work is properly credited.