Estimation of Aurangabad Bus Depot Structure with the Help of BIM by using A Revit And Microsoft Excel Softwere for Redevelopment

Authors

  • S.S.TANGADE (P. G. Student : Civil Engineering Department, D.Y.Patil Institute of Engineering and Technology(DYPIET)Ambi,Savitribai Phule -Pune University,Pune)
  • U.R.SAHARKAR (Assistant Professor: Civil Engineering Department, D.Y.Patil Institute of Engineering and Technology (DYPIET)Ambi,Savitribai Phule Pune University,Pune)

Keywords:

Infrastructure, Building Information Modeling, Microsoft Excel

Abstract

The public transport system is in con-stant development.Leading to redevelopment of bus terminal land .The project work is about redevelopment of Aurangabad bus depot with the help of building information modeling(BIM) pro-viding a linkage between important cities and terminal such as jalna,beed,jalgaon etc.When tr-ansist infrastructure is designed to enhance passenger experience,its attractiveness is ensured making it viable alternative to private motorized transport.BIM technique render all project part-icipant to obtain proper information at due time as necessary assist project understanding ,reduce common mistake and support project related decision.CIDCO bus-stand project is presented as a redevelopment land to realize the actual use and benefit of BIM. Cost control plays a major role for being competitive while maintaining high quality levels.

References

MoUD, M. o. U. D. 2006, National Urban Transport Policy(NUTP), Ministry of Urban Development.

Pingyu YAN1, Xifeng XIE2 And Yan MENG3” Application Of BIM Technique In Modern Project Management” Construction And Management 302(2014)

Grilo, A.,Jardim-Goncalves, R.Value proposition on interoperability of BIM and collaborative working environments. Automation in Construction 19 (5),( 2010)

R. Volk Et Al. “Building Information Modeling (BIM) for Existing Buildings -Literature Review and Future Needs”Automation in Construction 38(2014)

Ahmad Jrade and Julien Lessard “An Integrated BIM System to Track the Time and Cost of Construction Projects: A Case Study (2015)

Su-Ling Fan,Chen-Hua Wu and Chien-Chun Hun “Integration of Cost and Schedule Using BIM” Applied Science and Engineering(2015)

L.W.C. Lai Et Al.” Acquisition And Redevelopment Of Bus Depots: A Hong Kong Land Policy And Planning Case Study” / Habitat International 39 (2013) 75e84

D.Bryde,M.Broquetas,J.Marc-Volm“The Project Benefits Of Building Information Modelling (BIM)”-International Journal Of Project Management Xx (2013)

Martinez, M. (2006). Rule dynamics: Toward a theory of rule change in organizations.

State university of New York at Albany, US, 34-56.

Downloads

Published

30-06-2019

How to Cite

S.S.TANGADE, & U.R.SAHARKAR. (2019). Estimation of Aurangabad Bus Depot Structure with the Help of BIM by using A Revit And Microsoft Excel Softwere for Redevelopment. International Journal for Research Publication and Seminar, 10(2), 12–16. Retrieved from https://jrps.shodhsagar.com/index.php/j/article/view/1248

Issue

Section

Original Research Article