To Study & Analysis Construction Equipment Used in Construction Projects For Improving Productivity.
Keywords:
Equipment, Construction management and equipment management, questionnaireAbstract
Construction equipment is on the list of main sources in the building process for construction companies. This analysis seeks to look at the process of construction equipment management in Construction Company. The study focuses on checking out the process as well as issues as the lake of distinct guidelines and policy, accessibility of the spear thing, insufficient development and training, not enough other factors and skilled manpower that may affect construction equipment management training in construction equipment, to answer research questions the study adopted the diverse research approach. The study used a descriptive research strategy and used secondary details, as well as major sources like organized interview and questionnaire, had been performed with enterprise management numbers, project managers, case team leaders, and senior technicians. The interview and survey were done through a purposive sampling technique. For the benefit of getting the goals of this particular research, questionnaires have been analyzed in a form that is descriptive and results have been shown in a table with help of a statistical package just for the public science (SPSS) system and information from the interview and also document reviews have been
interpreted qualitatively. The final results indicate that building equipment management practices from different perspectives of equipment management aspects in the building are assumed to be inadequate.
References
.Aviad Shapira and Marat Goldenberg, “AHP-based equipment selection model for construction projects”,journal of construction engineering and management, ASCE, december 2005.
. Dushyant A. Deshmukh and Parag S. Mahatme, “Factors Affecting Performance of Excavating Equipment: An Overview”, International Journal of Science and Research (IJSR), SSN: 2319064, Volume 5 Issue 1, January 2016.
. Prajeesh. V. P and Mr. N. Sakthivel, “Management of Equipment & Machinery in Construction”, ISET- International Journal of Innovative Science, Engineering & Technology, Vol. 3 Issue 5, May 2016.
. Kunal r ghadge and Ashish b Ugale, “construction equipment management for construction of dam site”, international journal of science and research (ijsr), ISSN: 2319-7064, volume 4 issue 5, may 2015.
. Mr. Nilesh D. Chin chore and ProofPanay R. Khari, “Planning and Selection of Heavy Construction Equipment in Civil Engineering”, Int. Journal of Engineering Research and
Applications, ISSN: 2248-9622, Vol. 4, Issue 12( Part 1), December 2014, pp.29-31.
. Peurifoy, R. L., Schexnayder, C. J., and Shapira, A., (2006). Construction planning, equipment, and methods, 7th Ed., McGraw-Hill, Boston.
.Amirkhanian,S.,&Baker, N., “Expert system for equipment selection for earthmoving operations”, Journal of Construction Engineering and Management , 118 (2). (1992). 318-331.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2020 International Journal for Research Publication and Seminar
This work is licensed under a Creative Commons Attribution 4.0 International License.
Re-users must give appropriate credit, provide a link to the license, and indicate if changes were made. You may do so in any reasonable manner, but not in any way that suggests the licensor endorses you or your use. This license allows for redistribution, commercial and non-commercial, as long as the original work is properly credited.